When submitting drawimgs for approval and permits is is it better to have them done by an A and E firm or EC. I know EC can submit drawings but is there a limit tto service and or hoe much an EC can actually design?
When submitting drawimgs for approval and permits is is it better to have them done by an A and E firm or EC. I know EC can submit drawings but is there a limit tto service and or hoe much an EC can actually design?