I have a 100 kw generator with 400 amp auto transfer switch running on the farm. I have a 80 kw with 400 amp auto transfer switch I want to install as a back up to the back up.
I only need to 80 Kw to start if the 100 Kw fails or does not take the load with in 5-7 minutes. I do not want both to run at same time.
Has anyone ever seen a setup like this that could give me a wiring schematic of the safest way to make it work.
The 100 Kw is wired and working but power is very critical with my operation so any advice will be appreciated.
I only need to 80 Kw to start if the 100 Kw fails or does not take the load with in 5-7 minutes. I do not want both to run at same time.
Has anyone ever seen a setup like this that could give me a wiring schematic of the safest way to make it work.
The 100 Kw is wired and working but power is very critical with my operation so any advice will be appreciated.