wireguru said:holy crap thats alot of pipe. where is that?
don't need to if just 3 current carrying conductors in each pipe.Mike01 said:I hope they de-rated conductors for heat
peter d said:Only one is getting used. The rest are spares.
wireguru said:holy crap thats alot of pipe. where is that?
Nick said:It a 535MW power plant in Long beach, CA.
480sparky said:Will these do?
RB1 said:Does anybody know where I can find some good photos of a concrete duct bank with steel reinforcement for a class?
jrannis said:Brings back bad memories
im with ya, its hard to show off your work if there is a parking lot on top of it.:roll:480sparky said:Any underground work brings back bad memories for me. I hate UG.
mattsilkwood said:im with ya, its hard to show off your work if there is a parking lot on top of it.:roll: