Member
- Location
- Dallas Texas
Normally dont rewire old duplexes but the way things are need the work. I am building a new service for a duplex. My load calculations call for 150 amp load center for each unit. They are not total electric but if they do become total electric 150 amps will be enough. Service entrance conductors will be sized at 250mcm. I am using a dual meter base 300 amp. 150 amp outdoor loadcenters are hard to find and very expensive. Can I use (2) 200amp panels? Can I size the feeders from the meters to the panels for 150amps? And last can I keep the service conductors at 250mcm? Trying to keep the cost down. What is standard in this situation?
Thank you for any advise.