Millbank condo meter socket with two meter. Each meter has its own disconnect. The question is: Since the service disconnect is located in the meter hub the EGC from the water main as well as the ground rods must be brought to the point of disconnect and attached to the grounded conductor terminal at the service disconnect. Would the service panals then be considered as sub panals requiring the the neutrals and grounding conductors to be separated and the bonding jumper not installed.