I'm installing a sub-panel fed with a 60A 2p breaker in the main panel. I will be pullin in 3 #6's and a #10 for the EGC. I have an issue where I want to move 8 circuits from one panel to the new sub-panel using a 1" Sch 40 PVC nipple. The nipple is about 4" in length so I don't have to be worried about the derating of 310.15(B)(2)(a).
My question is do I have to reroute the EGC's of the eight circuits or can I leave them in the original, main, panel?
As always thanks in advance.