I have electrical room in two tenants space. Inside electrical room have Swgr #1 and Swgr #2 and they both have feeder breakers that feed to each tenant space panelboards. Both Swgrs are 480/277V, three phase, 800A
The electrical room has two doors. One door #1 attached sketch goes outside and another door #2 leads to tenant #2.
Can the door#2 lead to another tenant space and be code compliant or not? Which section would that be?