We are looking to group 3 electrical services on a single building. Two of the services are for individual tenant spaces and the third is the house panel. Our installation will be similar to the one noted in the 2011 handbook exhibit 230.10 on page 157. Due to space constraints we plan on installing a wireway above the meter cans with the service disconnects under the meter cans. Can anyone tell us if the incoming service laterals are required to be spliced in the wireway (junction box) or can they be run straight through to each respective meter base?