ghostbuster
Senior Member
- Location
- Great White North
These overhead 3/0 cables melted through and caused a subsequent electrical failure within a nearby building.The lost production cost was over $400K. for this one facility.The electrical load from this one facility is 400-475 amps.The utility repaired these cables as per the picture enclosed.Any comments?(please have patience, I am trying this picture paste program for the first time)