mshields
Senior Member
- Location
- Boston, MA
In instances when elevators are required to have generator backup; here in MA and I believe typically per the IBC, when there are 4 or more stories above the level of discharge, is it considered an Article 700 Emergency Load, an Article 701 Legally required Emergency load or is it governed via another set of rules unto itself?