I'm working on a medical office building attached to the existing hospital. There was no em power being routed to existing building from old to new. After rough in of ALL the walls were complete they decided to add temporary/permanent generator. I will have ATS inside with diconnect outside with plug for temp generator. ? is my power is routed in the walls tying plugs that will be normal to plugs that now are em. Any solutions?