volt101
Senior Member
- Location
- New Hampshire
If There was a building with 4 wings with a lighting contactor with a 120 volt coil controlling a 3 phase 480/277 lighting load for the general lights in the hallways throughout the wings. Only two phases enter a hallway. Switches at all hallways.
What voltage rating shall I order for the EBU's?
What circuit(s) do I have to tie too?
What voltage rating shall I order for the EBU's?
What circuit(s) do I have to tie too?