EMT LB Body Through Wall To Panel

Status
Not open for further replies.

Atvkid4eva

New User
Location
Ohio
Occupation
Engineer
I am running some 1” EMT for a welding circuit. I am to the point where I need to pass through 7/16” plywood and then go up and into the bottom of my sub panel. I’m thinking that a LB body is best for this to pass through the wall and it will give me a spot to pull the wires. What would you guys recommend I do behind the wall? Flexible conduit of some sort? I would prefer to not remove the plywood if possible. Let me know what you guys would do to make this as clean as possible. Pics below for reference, I have not drilled the pass through hole yet. Thanks!



 
I am closing this thread, in accordance with the Forum rules. This Forum is intended to assist professional electricians, inspectors, engineers, and other members of the electrical industry in the performance of their job-related tasks. However, if you are not an electrician or an electrical contractor, then we are not permitted to help you perform your own electrical installation work.


If I have misjudged the situation, if for example this project is related to your work, then send me a Private Message. If you can show me that I am wrong, and that you are a licensed electrician (or at least a licensed apprentice), then I will reopen your post, and offer an apology for the delay and inconvenience
 
Status
Not open for further replies.
Top