varundev
Member
- Location
- Maricopa, AZ USA
Hello all, this is my first post. I've been reading a while and you all have a lot of experience, which is appreciated. I'm trying to figure out the correct way to end future conduit underground, if we can. I'll be pouring concrete and was going to run three futures, but I'm wondering if I can just cap the PVC pipe at the end of the run. Should the conduit be connected to the service panel on the other side? My plan was to run the conduit from the service panel and end it about two feet past where the concrete will be, cap it, and bury it 18 inches deep. Would this pass inspection? I am pulling a permit since one of these futures will be for a pool. I couldn't find the electrical conduit cap and bought the white "sprinkler" cap, but this made me wonder if I can do this and pass inspection. Thanks for any help.