I am inspecting a college campus building that is being remodeled and have questions about the engineering. This building has a 200 amp feeder that feeds two, 200 amp panels groupled together on the 2nd floor and then two, 200 amp panels groupled together on the 3rd floor. All panels are feed through panels. The feeder and panels are rated for the calulated load that each panel has. This installation does not seem to allow anything for future growth though. I can not seem to find anything in the NEC that would prohibit this installation but I'm uncomfortable with approving it. The project manager for the school does not seem to realize that they do not have 200 amps capacity at each 200 amp panel. I would be happy to have views and input from other inspectors on this.