Alwayslearningelec
Senior Member
- Location
- NJ
- Occupation
- Estimator
If you had large 2-3 section 3000A switchgear equipment going on ground floor on grade what would be the best way to get into the building assuming ground can handle weight? Electric Pallet Jack?