Why does a similar requirement to bond a GEC at both ends of a ferrous pipe (as in 250.64(E)) not apply to equipment grounds that may be in a steel conduit, but not grouped with any other circuit conductors? Example would be to ground an existing outlet while using a steel protective sleeve.
Why a GEC but not an EGC?
Looking for a technical explanation.
Why a GEC but not an EGC?
Looking for a technical explanation.