HoosierSparky
Senior Plans Examiner, MEP
- Location
- Scottsdale AZ
- Occupation
- Senior Plans Examiner
When running an EGC from the mounting rails of an array through a combiner panel and controller panel to the MSP can the size of the EGC be reduced? For example, you start with a #6 bare CU at the rails to the 1st J-box, land it there and change to a #8 insulated to the combiner. Can you reduce to a #10 from there to the MSP?