10-4 on the two holes, but I am still concerned about the aluminum rain gutter and the device that appears to be a natural gas regulator.
To be even more picky, I note a lack of provision for box offsets. Using one holes with back straps, to me, is a better method if no provision for offsets are incorporated.
Our POCO want drip loops. (I see none in your pic) and a max meter height of 5 feet. Just curious, what is the meter height, and what is the height of the lowest point of the triplex to finished ground?
Don't take this personally, I live in the Land of the Code Nazis and now think like them when I see other sparky's work.