Hello,
I am working with a client who would like to put a 21,000 sq ft addition on to their school. They only want a study and cost estimate done for now. I will be able to determine the new mechanical load, but what VA/sq ft number should I be using for the general use spaces? This is a school and we will be well below the 3VA/sq ft for lighting load (I will still use this number), but what about receptacle load?
Thank you
I am working with a client who would like to put a 21,000 sq ft addition on to their school. They only want a study and cost estimate done for now. I will be able to determine the new mechanical load, but what VA/sq ft number should I be using for the general use spaces? This is a school and we will be well below the 3VA/sq ft for lighting load (I will still use this number), but what about receptacle load?
Thank you