Estimating software

ronball

Member
When using software to count outlet and switch quanites, it gives a material quote and a labor quote,
same as on lite fixture openings. The question is, does this also included the time required to install the
fixtures and switches and outlets or just the rough in amount?
 

cdslotz

Senior Member
If you are talking about device "assemblies" they include the device material and labor (recept, switch, etc) both rough and trim

Light fixture are the same, but not the price of the fixture unless you have it set up that way
 

ronball

Member
What about demo labor. removing outlets and Switches etc.
Would you use less labor for removing?

Thx Ron
 
Top