I have 40A 240V single phase feeder from building feeding EV charger in parking lot.
So I do have outside feeder. There is also concrete pole for the one EV charger.
There is one breaker lockable in the building feeding the EV charger. Question would NEC 2017 Article 225.32 require additional disconnect at the EV charger?