I think I understand what your asking now. Pipe fill requirements and additional pipes versus derate for conductor size.

Don provided a good answer.

Keep in mind voltage drop as each run get longer. Size accordingly and don't forget about EGC.

Use a conductor that has 90c wet location for your derate.

You may look into a feeder set up to reduce over all conductor cost. Versus all brach runs each getting longer as you go. Maybe four feeders than branch.

That will help with VD as well
I think I understand what your asking now. Pipe fill requirements and additional pipes versus derate for conductor size.

Don provided a good answer.

Keep in mind voltage drop as each run get longer. Size accordingly and don't forget about EGC.

Use a conductor that has 90c wet location for your derate.

You may look into a feeder set up to reduce over all conductor cost. Versus all brach runs each getting longer as you go. Maybe four feeders than branch.

That will help with VD as well
I have the model number of post But i had a hard time getting specs As far as install
For instance Can u stub up into them terminate And have second stub and 2 nd set of wiring continue Or is it 1 pipe per post Maybe run quarzite box and 1 pipe per post Also my original post on pipe fill regards to what u replied But this is i see it going on sites like this
900 am 26 cars (evetually) pull up Stsrt charging All continuous high demand Breakers should get a space between them Im sure this will get hot Up sizing wire Would this help on heating 26 cars pulling up at 900 am Will happen
 