If and existing marina has power pedestals that were not required to have GFI or EPD breakers installed and they decide to update the breakers to include ground fault protection does that require the distribution breakers be upgraded as well? I believe NEC 2017 states 30mA trip at the pedestals but I can't determine if that requires once the breaker is changed for all NEC to be implemented.