Any of you guys have tricks/tips when installing a 4" box in existing gypsum wall and have to support the box from stud to stud?
1. Would you cut the wall open vertical all the way to snake MC cable down if you have to feed from above?
2. Can you just get away with cutting the wall open from stud to stud where the box will go and be supported?