Yes it only applies to the GEC...:thanks guys
thought so.... you either need a cadweld mold for the size wire
needed, or a one shot mold....
they aren't that hard to use, if you've never cadwelded...
gloves and face shield. the stuff burns at 3,000 degrees F.
make sure EVERYTHING is dry... the ground rod, and the conductor.
this is VERY IMPORTANT!!!!
now, where to get the cadweld stuff? your wholesale house might
have it, but most likely won't.
here is where you can get everything you need to ground anything...
they have a larger cadweld inventory than erico, by about double the
amount. they are in buena park, calif. they ship everywhere.
Mayday Grounding
http://www.maydaygrounding.com/
they are experts at dealing with cadweld virgins. it won't hurt.
bring money... this stuff isn't cheap. you can leave with a small
cardboard box the size of a six pack, and have $500 in it, easy. :-(
a couple of one shots will probably only be $25, however.....
randy