:-? Bidding a job today,where the E.E. shows a detail for underground duct banks.Along with the detail, he has a note to provide expansion fittings every 10' for the undergound raceways. The duct banks consist of 4"&2"conduits for primary,secondaries,tele.,and fire alarm.Some of the lenghts exceed 400 ft,carrying expansion fittings per his detail will be extremly costly,which may cost us the job. I/ve never heard or seen this done,any thoughts...?