Cavie Senior Member Location SW Florida Aug 21, 2007 #21 EMO said: cshmid If there is a way, I'd like to know about it. Click to expand... Have the contractor get a letter from an engenieer accepting responcibility. that is how we handle those types of things.
EMO said: cshmid If there is a way, I'd like to know about it. Click to expand... Have the contractor get a letter from an engenieer accepting responcibility. that is how we handle those types of things.
D dbuckley Senior Member Location Canterbury, New Zealand Aug 22, 2007 #22 You could get an electrical engineer to test it and pronounce it acceptable or otherwise; place a stressful electric field across the site and measure just how equipotential the equipotential zone is...
You could get an electrical engineer to test it and pronounce it acceptable or otherwise; place a stressful electric field across the site and measure just how equipotential the equipotential zone is...