LeeEugene
New User
- Location
- Evanston, IL
- Occupation
- Professor, biomedical engineering
I'm planning to run #6 THHN in 3/4 EMT from a basement breaker box to an exterior Tesla wall mount charger. I can go through cement block below grade or brick above. I assume the former is better for ease of drilling at the expense of a bit of digging and waterproofing. Am I overlooking anything?