Regarding a 1600 amp exterior pad mount main service that feeds 3 separate buildings on the same property.
-can I put the ufer ground(for the main service) in the bottom of the duct bank sub feeder that leads to one of the buildings?
-also according to 250-32 will I need a separate grounding electrode at each separate building?
-can I put the ufer ground(for the main service) in the bottom of the duct bank sub feeder that leads to one of the buildings?