metallica5
Member
- Location
- Metro DC
I have a project that calls for Fall of Potential test OR alternative in accordance with IEEE Standard 81. New School has 1200 amp 480/277 3 phase service. we have 3 ground rods in a triangle 15' apart with 4/0 copper into the main gear. There is also 3/0 to the water main from gear and another to building steel. This is all done per their plans/specs. My first question is: Can a three point test be done while gear is energized? My second question is what is an alternative test that would be in accordance with IEEE Standard 81.
Thank you for help.
Thank you for help.