I have an install coming up for 3 -5 ton ac units. 36mca/60 max breaker or fuse. Will need a sub as thier are only 3 spaces left in the 30 space ch single phase 200 a panel in this building. if i were to use a sub panel adjacent to the main would i sisze the feeders to this the same as you would do for a multimotor load? 125%of the first and the sum of the rest? Thinking about using a 125 a panel w/3 60 two poles for the units and # 1 cu feeders correct?