steelersman
Senior Member
- Location
- Lake Ridge, VA
Hi guys. I was hoping to get some clarification about the types of cabling allowed to feed sub-panels in detatched buildings. I was told that you must use 3-wire instead of 4-wire and drive a ground rod for the new sub-panel if it's a detatched building, but if it's attatched then 4-wire is fine. Is this true and also if so which year of codebook did that change, because I've always used 4-wire and never driven a ground rod for the new sub-panel. Also if 3-wire is fine then can you use USE for direct burial and just protect it with pvc where it comes up from the ground? I just want to get a better understanding of this and also the USE. I've never used it and don't understand where and how it's able to be used. It seems like the kind of cable the power companies use. Thanks.