Ben Trueblood
Member
I have a situation where (4) 100 Amp panels were engineered to be fed from one feeder and tapped at each panel location. The panels are in a Condo building and are stacked one over the other on each floor. The original engineering called for conduit to be ran and wire would be pulled continuous from the Main Distribution to the first floor panel and on up to the fourth floor.
My question is if I were to run say MC cable from the MDP to the first floor panel and tapped at that location then continued on up with the MC cable would that be considered a violation of the tap rule because the wire was not contiuous? Would the measurement of the 25 ft. start from my tap location on the first floor?
Thanks for the insight.
My question is if I were to run say MC cable from the MDP to the first floor panel and tapped at that location then continued on up with the MC cable would that be considered a violation of the tap rule because the wire was not contiuous? Would the measurement of the 25 ft. start from my tap location on the first floor?
Thanks for the insight.