I did not get dinged but he said it’s not really correct.
I have a meter and fussed disconnect remotely and a feeder comming in through a large walkable slab foundation. It comes through the side and I lb up and over 6 feet to the opposite side of the exterior wall.
Is nearest point of entry considered through the floor to panel or as soon as the pipe emerges though the ground.
I have a meter and fussed disconnect remotely and a feeder comming in through a large walkable slab foundation. It comes through the side and I lb up and over 6 feet to the opposite side of the exterior wall.