I am running power from my house to my pole barn, 180ft, connecting to a 125amp sub panel that has a 50, 30 & 20amp receptacle preinstalled. It also has 4 extra spaces that I will be using to run from the sub panel to shed for lights and a light duty window a/c unit. Can I use 2-2-4-6 Aluminum Direct Burial MHF? Is it required to be run in conduit? For the less than 5ft from sub panel to shed can I use 6/3 direct burial for 2 outlets, a light and the window a/c unit?
 
I am closing this thread, in accordance with the Forum Rules.

This site is designed for:
  • Contractors
  • Electricians
  • Engineers
  • Inspectors
  • Instructors
  • Other electrically related individuals

* This NEC Forum is for those in the electrical and related industries. Questions of a "How-To" nature by persons not involved in the electrical industry will be removed without notice.
If you feel this action to be in error, feel free to contact me via PM to explain.

A reminder to all members, if you see a questionable post, feel free to report it by clicking report at the lower left hand corner of the post
 
Status
Not open for further replies.
Top