We have a installation that has a 1600amp substation breaker with 4 sets of 500 kcmils feeding 2 seperate 800 amp fused switches. 2 sets of 500 kcmil feed switch 1 and 2 sets of 500 kcmil feed switch 2 from the 1600 amp breaher directly. Both switches are fused at 800 amps.
The question is can you split the service entrance conductors into 2 sets each and feed 2 seperate loads directly from the upstream breaker?
What section of code is this acceptable or unacceptable???