The POCO in our area will not allow me to mount any disconnect on the left side of the meter enclosure. The inspector is using 312.8, and 230.7 (2005 code) and not allowing my service conductors to run thru on disconnect. This is a 400 amp set up, 2'' nipple from meter to a feed thru M.B. panel, 2'' nipple from this enclosure to a 225 ecc with a ch2200 installed in this enclosure. The feed thru allows for a future barn or shop.
I don't feel that I have violated any of these rules, these 4/0 alu conductors don't fill the area to more than 40% and I don't consider the disconnet to be a raceway. I normally mount on either side of the meter, but this POCO will no longer provide power if that is the case. I don't want to pipe around one disconnect to get to another. The rules that the inspector is citing are they legit violations.
I don't feel that I have violated any of these rules, these 4/0 alu conductors don't fill the area to more than 40% and I don't consider the disconnet to be a raceway. I normally mount on either side of the meter, but this POCO will no longer provide power if that is the case. I don't want to pipe around one disconnect to get to another. The rules that the inspector is citing are they legit violations.