What are the options & considerations necessary to take a new 3-phase feed from an existing pole that is already feeding one 3-phase load? I.e., one building is being fed 3-phase 12,470 from a pole, if you want to take a 2nd 3-phase feed from the same pole to a new padmount, what would standard practice dictate? Add a pole with separate fused cutouts for the new building? Add a crossarm to the pole if there is enough space? I know the NESC has clearance requirements between devices, what other considerations are there?
Could the existing cutouts be replaced with a cutout that would allow two connections on the load side (i.e., does such a cutout exist)? I don't see anything like that from Cooper but I'm still learning.