What are the issues with field installing UL 1053 terminal blocks which are recognized and not listed in outdoor metal cabinet. Is this an actual code violation or less than best practice?
What are the issues with field installing UL 1053 terminal blocks which are recognized and not listed in outdoor metal cabinet. Is this an actual code violation or less than best practice?