Can FP be fed out of (2) separate diesel generators via fire pump transfer switch/controller? The first generator also serve building egress emergency panel. The second generator is dedicated to fire pump. Thought NEC requires FP to be fed out of a reliable power source?
	
		
			
		
		
	
				
			 
				
 
 
		