ELECTRIC ACE
Member
- Location
- Kemah, Texas
- Occupation
- Electric Contractor
I am faced with a similar Question;
Can anyone tell me?
If I install a generator on site. With two OCP?s One for Building with shunt trip and the second one for Gen. Set. Sized for Locked Rotor,
Can I eliminate the service feeder from the power company?
Can anyone tell me?
If I install a generator on site. With two OCP?s One for Building with shunt trip and the second one for Gen. Set. Sized for Locked Rotor,
Can I eliminate the service feeder from the power company?
