480V service w/ a 208V pump in an existing building. I tap the electrical service ahead of the main disconnect and into a disc switch w/ fuses and then to a transformer that is dedicated to the fire pump and into a secondary disc switch w/ fuses. Are the secondary conductors that are feeding the fire pump controller required to be routed outside the building or in 2" concrete or can they be installed within the building if they are 1hr rated?