That's correct if the system is setup for Wye start, Delta run. (58%*125%=72%) {430.22(C)}125% to controller Wye to delta run then controller to motor 72% but I have been rusty today
I would wait to verify for the other more experienced in this area, but I’m thinking the jockey pumps get wired like any other motor in the building.Does the jockey pump fall under the same rules if it's used for the fire pump in otherwords 2 hour rating , its own service etc or could it just come off a regular ckt in the building
Sent from my SM-G986U using Tapatalk
Tap ahead of main then in slab?Main service gear
Sent from my SM-G986U using Tapatalk
Correct yesTap ahead of main then in slab?
Correct yes
Sent from my SM-G986U using Tapatalk