H HDS913 Member Nov 1, 2007 #1 When fire stopping drywall in high rise condos, for holes that have been drilled or cut in the drywall for conduit pass through, is it required to fire stop all holes or only holes in walls that separate units and lead to hallways?
When fire stopping drywall in high rise condos, for holes that have been drilled or cut in the drywall for conduit pass through, is it required to fire stop all holes or only holes in walls that separate units and lead to hallways?
roger Moderator Staff member Location Fl Occupation Retired Electrician Nov 1, 2007 #2 Duplicate thread Roger