I should know this but my code book has come up missing and I am having trouble remembering(age).
Replaceing service and fused panel with load center. Need disconnecting means outside next to the meter base then to the load center. Is the load center now a sub panel or can I run seu to the new load center from disc as long as I don't bond the Neut in the disc.? LC is in middle of home.
Replaceing service and fused panel with load center. Need disconnecting means outside next to the meter base then to the load center. Is the load center now a sub panel or can I run seu to the new load center from disc as long as I don't bond the Neut in the disc.? LC is in middle of home.