iwire said:That sounds unethical to me.
Maybe it's unethical to have a free estimate, then add that cost into the job.
Maybe it's unethical to have free coffee, then add that cost into the meal.
Maybe it's unethical to low-bid, then make the profit on extras.
Maybe it's unethical to have a loss-leader, then markup other items to cover the cost.
For me, it works both ways. If I quote a 2 hour troubleshoot & it's the first thing I look at, I reduce that fee. Sometimes I leave that fee alone and have a no-charge or reduced-charge repair.