Re: Flate Rate vs T&M vs Cost Plus
I don't have a contract up and running as i am not contracting anymore. it contained disclaimers and required info.
What is relevant to this aspect of this discussion is that my bid contained the scope of the work to code, to pass inspection. A reference to a specific set of plans, or to a complete listed description, with limitations for remodeling. It contained inclusions like being present for inspections. It contained the manner in which changes were to be agreed upon, either as set price or per hour+costs and %profit. And it contained a price for said work with a sentence like this... "I propose to do the above described work for the price of...."
This sentence was set apart from the others and was followed by a place for me to sign and date and for the owner or contractor to sign and date.
That type of contract is generally suitable for small projects, remodels, etc. But for McMansions and above you actually need a contract designed for you by your lawyer and insurance agent (lawyer last).
hope this helps. I never usually described materials unless it was time and materials. Some contractors just add 40 to 50 % on each, some use price guides with different guidelines for types of work. I thought that was a paperwork nightmare since I was doing the work as well. I said it cost this much, and if they wanted it broke down I assumed that they were going to argue about my time as well, and that my time would be spent better elsewhere. I would rather be poorer than feel pissed on just because i have to work. I didn't think it was their business to pick my bid apart.
If they needed a lower bid, I asked them to lower the amount of work. There were a few that I bid high to give a discount to, to make sure that job was ready, clean, completely framed and rough plumbed and the mechanical was roughed, AND I had the job to myself.
paul