- Electrician / FA Contractor
I have a few of the FBBOX-GY floor boxes going in. This is my first time doing it for a concrete slab. The slab on grade assembly is dirt - 4 inches crushed gravel - 2 inches XPS foam - 6 mil vapor barrier - 5" concrete slab - sika sealee ans finally a 3/4 inch hardwood floor. For the floor outlets does my sch40 need to be in the dirt or can I place it on top of the dirt so it's withing the 4" of crushes gravel? Not sure what the best practice is. Thank you