Hello all,
I’m working on a site where the client wants the entire 800A Main Distribution Panelboard (MDP) backed up by a single generator.
They also want to avoid using battery backups for emergency lighting. I'm figuring to place the lighting on a new 100A Panel 'EM', but not sure how to provide normal power to it.
Per code, emergency lighting must be powered from a source separate from normal lighting.
Here was my brief thought:
I’m struggling to figure out a simple solution without introducing more equipment.
Thanks in advance.
I’m working on a site where the client wants the entire 800A Main Distribution Panelboard (MDP) backed up by a single generator.
They also want to avoid using battery backups for emergency lighting. I'm figuring to place the lighting on a new 100A Panel 'EM', but not sure how to provide normal power to it.
Per code, emergency lighting must be powered from a source separate from normal lighting.
Here was my brief thought:
- 800A MDP powers:
- Circuit 1 – 400A Panel 'A'
- Circuit 2 – 400A Panel 'B'
- Circuit 3 – 100A Panel 'EM'
- 800A ATS feeds the MDP (normal loads backed up by generator)
- 100A ATS feeds Panel 'EM' (emergency lighting backed up by generator)
I’m struggling to figure out a simple solution without introducing more equipment.
Thanks in advance.